• Client Testimonials
  • Home
  • Our Services
  • Case Studies
  • Our Clients
  • About Us
  • Contact
  • Head Office - 0141 427 6566
  • E-mail the Head Office
  • Grangemouth Office - 01324 474 790
  • E-mail the Grangemouth Office
Case Studies (Tap to slide up/down)
Case Studies :
The Hydro Arena
Glasgow 2014
Strathclyde Fire & Rescue
Asda Distribution Centre
Carlisle College
EICC
Maggies Centre
South Glasgow University Hospital
Scottish National Portrait Gallery
Project Atlas
Sutherland Avenue
Waverley Station
  • The Hydro Arena
  • The Hydro Arena

The Hydro Arena

Lend Lease – Construction Management

Project Details

Created by world-renowned architects Foster and Partners, Scotlands new national arena holds 12,000 fully seated and is the largest entertainment venue in Scotland. The Hydro is the only venue of its scale in the UK built specifically for concerts, conferences and events.

Our Involvement

From installing survey control stations and checking primary building elements to producing 3D models of critical structural items, we have provided high accuracy setting-out and surveying services to our client throughout the three year period of this construction project.

Using our high accuracy Leica 1200 series total stations and Leica HDS Laser Scanner we were able to give our client an accurate representation of constructed items and undertake comparisons to the supplied 3D design models.

Services Provided

  • Engineering Surveying
  • Laser Scanning
  • Monitoring
  • Setting Out
  • Topographical Survey
  • Glasgow 2014
  • Glasgow 2014

Glasgow 2014

Lend Lease

Project Details

From the 23rd of July to the 3rd of August 2014, Glasgow hosted the XX Commonwealth Games. Installation of temporary buildings and management compounds were required prior to the opening of the games.

Our Involvement

Before visiting each venue we obtained the underground services as-built drawings from the local authorities & utility companies. By compiling this information into one ‘master’ drawing we were able to supply our field staff with a definitive plan of utilities as a starting point for site location work. After setting-out the locations of temporary buildings using our Leica Smartnet GPS system, we were able to thoroughly and efficiently scan for underground services using our electromagnetic cable and pipe locator along with our ground penetrating radar system. We then produced underground service location plans with temporary building design positions shown to allow our client to assess whether installation is possible at each location. Using the combination of GPS, Total Station, GPR and Cable Detector we used cutting edge, high-end hardware to ensure everything was done on site to successfully locate and survey all buried utilities..

Services Provided

  • Setting Out
  • Topographical Survey
  • Underground Services Location
  • case-studies
  • Sutherland Avenue

Sutherland Avenue

Client – Mrs. H. Corrigan

Project Details

Extension of dwelling-house.

Our Involvement

Using our high definition laser scanner, we were able to produce a highly accurate front elevation of the building. We also produced other building elevations and plans using a Leica total station. This information was required to enable the architect to design a suitable building extension and for planning purposes.

Services Provided

  • Laser Scanning
  • Topographical Survey
  • Waverley Station

Waverley Station

Miller Fabrications – Steelwork Contractor

Project Details

Over a four year period, the station has been transformed for the needs of the passengers in the 21st century while preserving Waverleys rich heritage. The renewal programme includes: replacing the station roof with strengthened glass, a new Market street entrance for increased accessibility, refurbishing the station concourse and main building exterior and improving platforms 8 & 9.

Our Involvement

Using our high definition laser scanner, we quickly and accurately surveyed the Balmoral Hotel and Princes Mall elevations which envelope the famous ‘Waverley Steps’. By producing sections along the existing access to Princes Street, we were able to give the designers an accurate representation of this complex space. This ensured the steelwork and glass were manufactured to fit a non-uniform space down the new steps / escalators, an exercise which would have been prohibitively time consuming and complex using a standard survey instrument and traditional drafting methods.

We have also provided as-built results for steelwork on various platform canopies and Market Street entrance using Leica total stations.

Services Provided

  • Engineering Surveying
  • Laser Scanning
  • case-studies
  • Strathclyde University Technology & Innovation Centre

Strathclyde University Technology & Innovation Centre

Lend Lease – Construction Management, Cementation – Piling Contractor

Project Details

The Technology & Innovation Centre is a hub for world leading research finding solutions to challenges that matter in areas of economic importance – including power and energy, health and manufacturing – and helping companies to compete globally.

Our Involvement

Having installed a high accuracy survey control network, we set-out all large diameter pile positions using a Leica total station. Continual monitoring was undertaken on adjacent roads & pavements throughout the piling process. Surveying concrete cores and steelwork gives our client confidence in accuracy throughout the construction process.

Services Provided

  • Control Networks
  • Engineering Surveying
  • Monitoring
  • Setting Out
  • Topographical Survey
  • case-studies
  • Strathclyde Fire & Rescue

Strathclyde Fire & Rescue

Lend Lease - Construction Management, BBGE - Piling Contractor

Project Details

This latest state-of-the-art fire training facility at Cambuslang will develop the regions fire fighters of tomorrow. The new facilities consist of a two-storey academic base, a facilities building with an eight-bay fire appliance garage and three practical training zones.

Our Involvement

After our initial installation of a more robust survey control network, we quickly laser scanned the constructed platform level of the entire site using our Leica HDS laser scanner. Using our LSS ground modelling software we then created a triangle model from this point cloud data for use in comparisons with design information. Being able to produce colour drawings showing differences from design to finished platform levels (using height banding and colour mapping techniques) means our clients can quickly identify problem areas and effectively rectify these problems with accuracy.
We undertook various other surveying and setting-out roles on this project including steelwork, concrete and brickwork setting-out and analysis, level surveys and comparisons, volumetric analysis and monitoring of tunnel structure.

Services Provided

  • Control Networks
  • Engineering Surveying
  • Laser Scanning
  • Monitoring
  • Setting Out
  • Topographical Survey
  • case-studies
  • Asda Distribution Centre

Asda Distribution Centre

Balfour Beatty Ground Engineering – Piling Contractor

Project Details

This 36 acre distribution centre in Grangemouth is Asdas latest large warehouse project in Scotland and is a new build of 497,000 square feet.

Our Involvement

Using supplied design drawings, we co-ordinated and checked all 4,721 pre-cast pile positions. Where discrepancies were found, these were reported back to our client for modification. The co-ordinated positions were uploaded to our high accuracy Leica total stations and positioned on site for multiple piling rigs to install. Our experience, technique and hardware allow us to supply our clients with a high speed method for positioning piles on site. Our setting-out and as-built data recording procedure enables us to provide our client with comprehensive results.

Services Provided

  • Engineering Surveying
  • Setting Out
  • case-studies

Carlisle College

Charles Henshaw & Sons Ltd. – Glazing Contractor

Project Details

This new college facility replaces outdated teaching accommodation. The existing building has been refurbished and re-clad with both buildings linked with a re-furbished foot bridge clad using a new planar glazing system.

Our Involvement

Using our high definition Leica laser scanner, we quickly and accurately surveyed the existing building faces and stripped-down link bridge steelwork. Dimensioned 2D drawings were produced for these structures for use in re-cladding design work. Due to the complexity of the link bridge steelwork, using an HDS scanner ensures all details were picked up with high accuracy. Our methods for processing HDS point cloud data means we can produce ‘easy to use’ 2D drawings for our clients.

Services Provided

  • Engineering Surveying
  • Laser Scanning
  • Setting Out
  • case-studies
  • EICC

EICC

SAS International – Curtain Walling Contractor

Project Details

The capitals newly extended venue for conferences, conventions and exhibitions is owned by the ‘City of Edinburgh Council’ and operates as an independent commercial venture offering the very best in facilities.

Our Involvement

Using a Leica reflectorless total station we surveyed cast-in halfens, steel brackets and concrete upstands. Drawings were produced for each level showing differences from design positions and heights. The completeness and accuracy of these results were crucial in our clients planning of glazing installation, giving them fore-warning of any problems with cast-in halfens or concrete upstand positions. This enabled our client to manufacture brackets to suit problem areas before attempting installation on site, saving them lost time by not having to react to each problem that occurs.

Services Provided

  • Engineering Surveying
  • Setting Out
  • case-studies
  • Maggies Centre

Maggies Centre

Glassolutions – Glazing Contractor

Project Details

Located at Aberdeen Royal Infirmary, Maggies Centre provides support to people with cancer and their families. This unique building was design by Norwegian design company ‘Snøhetta’ and opened in September 2013.

Our Involvement

Due to the shape of the building, we were required to provide accurate drawings showing the various sized oval apertures. This information was used in tailoring the glazing to correctly fit the oval openings. Survey work was carried out using a Leica reflectorless total station and drawings were produced as 2D elevations for ease of use for designers. The preliminary design mullion centre locations were overlayed with our surveys to give the glazing designers a starting point for modifiying their drawings. These methods are used to highlight any anomolies in the structure and maximise efficiency in the final design process.

Services Provided

  • Engineering Surveying
  • case-studies
  • South Glasgow University Hospital

South Glasgow University Hospital

SAS International – Curtain Walling Contractor

Project Details

The New South Glasgow Hospitals Project is the largest design and construction project in Scotland. The publicly funded development will give Glasgow one of the most advanced hospitals in the UK and will be the largest critical care complex in Scotland.

Our Involvement

Using our high accuracy Leica 1200 series total stations we surveyed circa. 400 halfen channels on each upper level. The halfen channels are used to mount the exterior façade using standardised brackets. Results drawings were produced (using our custom written halfen surveying software) to show differences from design halfen positions (laterally, in/out & orientation) as well as level results of halfen centre-line and slab / upstand design differences. The combined results highlight any problems with halfen channel location before bracket installation. Where the halfen channel presents only a small deviation from design location, brackets are modified and adapted using our survey results as a guideline. This method allows the correct bracketry to be provided for installers at every halfen location increasing the efficiency of façade installation.

In addition to highlighting all potential problems with bracket installation into halfen channel and producing highly accurate results to allow bracket modification, we also marked out design bracket centre-positions and offsets to face of brackets to further increase speed and accuracy of bracket and façade installation.

Services Provided

  • Engineering Surveying
  • Setting Out
  • case-studies
  • Scottish National Portrait Gallery

Scottish National Portrait Gallery

Charles Henshaw & Sons Ltd. – Glazing Contractor

Project Details

Following a three year refurbishment, Scotlands National Portrait Gallery is one of Edinburgh’s most remarkable buildings and houses a wealth of imagery and portraits of famous historical figures. Refurbishment included the installation of internal lift, new café & shop as well as secondary glazing of all main windows.

Our Involvement

Using our Leica HDS high definition laser scanner, we quickly and accurately captured a stand-alone 3D point cloud of each stonework window archway. We then used a Leica 1200 series total station to accurately record key positions on each archway for use in vertically positioning the models (using the Cyclone point-cloud modelling software). We were supplied with a specific window offset and produced a 12mm thick band within the archway where the secondary glazing was to be installed. This allowed our client to accurately size all new glazing and standardise screens where possible to reduce manufacturing costs. Producing results for the internal archways was carried out using the same method but with the addition of linework shown on individual stones for use in the accurate positioning of steel brackets. Results were supplied in PDF as well as AutoCad drawing file format (with accompanying image files) for use by our clients designers.

Services Provided

  • Engineering Surveying
  • Laser Scanning
  • Setting Out
  • case-studies
  • Project Atlas

Project Atlas

Balfour Beatty Ground Engineering – Piling Contractor

Project Details

185-221 Buchanan Street is the latest development in Glasgow city centre which combines multiple retail units below residential properties.

Our Involvement

Using a Leica 1200 series total station we were contracted to set-out the positions of all large diameter and mini piles. Using the reflectorless capability of the Leica instrument, we were quickly able to accurately calculate the lengths of the re-inforcing steelwork required for each large diameter pile. In addition to setting-out services, we also produced colour banded drawings showing where unexpected excavation limits were found over the entire site. The survey and setting-out methods we use for this type of pile installation ensure piles are installed at the correct location with the correct length of re-inforcing steelwork. As-built results are recorded for quality control purposes and are used by our client for charting progress.

Services Provided

  • Engineering Surveying
  • Setting Out
  • case-studies

Snedden Surveys

0141 427 6566glasgow@sneddensurveys.co.uk
01324 474 790grangemouth@sneddensurveys.co.uk
  • Client Testimonials
  • Home
  • Our Services
  • Case Studies
  • Our Clients
  • About Us
  • Contact
  • Client Testimonials
  • Home
  • Our Services
  • Case Studies
  • Our Clients
  • About Us
  • Contact
All content copyright © Snedden Engineering Surveys 2014
Back To Top