<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Snedden Surveys</title>
	<atom:link href="http://www.sneddensurveys.co.uk/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.sneddensurveys.co.uk</link>
	<description>Just another Ignite weblog</description>
	<lastBuildDate>Fri, 11 Feb 2022 13:11:09 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.8.6</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>Glasgow 2014</title>
		<link>http://www.sneddensurveys.co.uk/2014/08/06/glasgow-2014/</link>
		<comments>http://www.sneddensurveys.co.uk/2014/08/06/glasgow-2014/#comments</comments>
		<pubDate>Wed, 06 Aug 2014 10:21:19 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Setting Out]]></category>
		<category><![CDATA[Topographical Survey]]></category>
		<category><![CDATA[Underground Services Location]]></category>
		<category><![CDATA[case-studies]]></category>

		<guid isPermaLink="false">http://snedden2013.becomeclients.com/?p=264</guid>
		<description><![CDATA[From the 23rd of July to the 3rd of August 2014, Glasgow hosted the XX Commonwealth Games. Installation of temporary buildings and management compounds were required prior to the opening of the games.
Our Involvement
Before visiting each venue we obtained the underground services as-built drawings from the local authorities &#38; utility companies. By compiling this information [...]]]></description>
			<content:encoded><![CDATA[<p>From the 23rd of July to the 3rd of August 2014, Glasgow hosted the XX Commonwealth Games. Installation of temporary buildings and management compounds were required prior to the opening of the games.</p>
<h3>Our Involvement</h3>
<p>Before visiting each venue we obtained the underground services as-built drawings from the local authorities &amp; utility companies. By compiling this information into one ‘master’ drawing we were able to supply our field staff with a definitive plan of utilities as a starting point for site location work. After setting-out the locations of temporary buildings using our Leica Smartnet GPS system, we were able to thoroughly and efficiently scan for underground services using our electromagnetic cable and pipe locator along with our ground penetrating radar system. We then produced underground service location plans with temporary building design positions shown to allow our client to assess whether installation is possible at each location. Using the combination of GPS, Total Station, GPR and Cable Detector we used cutting edge, high-end hardware to ensure everything was done on site to successfully locate and survey all buried utilities..</p>
]]></content:encoded>
			<wfw:commentRss>http://www.sneddensurveys.co.uk/2014/08/06/glasgow-2014/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Project Showcase</title>
		<link>http://www.sneddensurveys.co.uk/2013/12/09/project-showcase/</link>
		<comments>http://www.sneddensurveys.co.uk/2013/12/09/project-showcase/#comments</comments>
		<pubDate>Mon, 09 Dec 2013 09:31:05 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[home-panels]]></category>

		<guid isPermaLink="false">http://snedden2013.becomeclients.com/?p=195</guid>
		<description><![CDATA[Learn more about The Hydro Arena project.
]]></description>
			<content:encoded><![CDATA[<p>Learn more about <a href="/case-studies/#the-hydro-content">The Hydro Arena</a> project.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.sneddensurveys.co.uk/2013/12/09/project-showcase/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Key Services</title>
		<link>http://www.sneddensurveys.co.uk/2013/12/09/key-services/</link>
		<comments>http://www.sneddensurveys.co.uk/2013/12/09/key-services/#comments</comments>
		<pubDate>Mon, 09 Dec 2013 09:29:23 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[home-panels]]></category>

		<guid isPermaLink="false">http://snedden2013.becomeclients.com/?p=193</guid>
		<description><![CDATA[Find a full list of our services here.
]]></description>
			<content:encoded><![CDATA[<p>Find a full list of our services <a href="/our-services">here</a>.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.sneddensurveys.co.uk/2013/12/09/key-services/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Client Testimonials</title>
		<link>http://www.sneddensurveys.co.uk/2013/12/09/testimonial/</link>
		<comments>http://www.sneddensurveys.co.uk/2013/12/09/testimonial/#comments</comments>
		<pubDate>Mon, 09 Dec 2013 09:28:28 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[home-panels]]></category>

		<guid isPermaLink="false">http://snedden2013.becomeclients.com/?p=191</guid>
		<description><![CDATA[View our client testimonials here.
]]></description>
			<content:encoded><![CDATA[<p>View our client testimonials <a href="/testimonials">here</a>.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.sneddensurveys.co.uk/2013/12/09/testimonial/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>slide2</title>
		<link>http://www.sneddensurveys.co.uk/2013/11/04/slide2/</link>
		<comments>http://www.sneddensurveys.co.uk/2013/11/04/slide2/#comments</comments>
		<pubDate>Mon, 04 Nov 2013 13:45:36 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[home-carousel]]></category>

		<guid isPermaLink="false">http://snedden2013.becomeclients.com/?p=125</guid>
		<description><![CDATA[]]></description>
			<content:encoded><![CDATA[]]></content:encoded>
			<wfw:commentRss>http://www.sneddensurveys.co.uk/2013/11/04/slide2/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Waverley Station</title>
		<link>http://www.sneddensurveys.co.uk/2013/10/31/waverley-station/</link>
		<comments>http://www.sneddensurveys.co.uk/2013/10/31/waverley-station/#comments</comments>
		<pubDate>Thu, 31 Oct 2013 13:35:01 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Engineering Surveying]]></category>
		<category><![CDATA[Laser Scanning]]></category>
		<category><![CDATA[case-studies]]></category>

		<guid isPermaLink="false">http://snedden2013.ignite.camus/?p=106</guid>
		<description><![CDATA[Over a four year period, the station has been transformed for the needs of the passengers in the 21st century while preserving Waverleys rich heritage. The renewal programme includes: replacing the station roof with strengthened glass, a new Market street entrance for increased accessibility, refurbishing the station concourse and main building exterior and improving platforms [...]]]></description>
			<content:encoded><![CDATA[<p>Over a four year period, the station has been transformed for the needs of the passengers in the 21st century while preserving Waverleys rich heritage. The renewal programme includes: replacing the station roof with strengthened glass, a new Market street entrance for increased accessibility, refurbishing the station concourse and main building exterior and improving platforms 8 &amp; 9.</p>
<h3>Our Involvement</h3>
<p>Using our high definition laser scanner, we quickly and accurately surveyed the Balmoral Hotel and Princes Mall elevations which envelope the famous ‘Waverley Steps’. By producing sections along the existing access to Princes Street, we were able to give the designers an accurate representation of this complex space. This ensured the steelwork and glass were manufactured to fit a non-uniform space down the new steps / escalators, an exercise which would have been prohibitively time consuming and complex using a standard survey instrument and traditional drafting methods.</p>
<p>We have also provided as-built results for steelwork on various platform canopies and Market Street entrance using Leica total stations.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.sneddensurveys.co.uk/2013/10/31/waverley-station/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Sutherland Avenue</title>
		<link>http://www.sneddensurveys.co.uk/2013/10/31/sutherland-avenue/</link>
		<comments>http://www.sneddensurveys.co.uk/2013/10/31/sutherland-avenue/#comments</comments>
		<pubDate>Thu, 31 Oct 2013 13:34:08 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Laser Scanning]]></category>
		<category><![CDATA[Topographical Survey]]></category>

		<guid isPermaLink="false">http://snedden2013.ignite.camus/?p=104</guid>
		<description><![CDATA[Extension of dwelling-house.
Our Involvement
Using our high definition laser scanner, we were able to produce a highly accurate front elevation of the building. We also produced other building elevations and plans using a Leica total station. This information was required to enable the architect to design a suitable building extension and for planning purposes.
]]></description>
			<content:encoded><![CDATA[<p>Extension of dwelling-house.</p>
<h3>Our Involvement</h3>
<p>Using our high definition laser scanner, we were able to produce a highly accurate front elevation of the building. We also produced other building elevations and plans using a Leica total station. This information was required to enable the architect to design a suitable building extension and for planning purposes.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.sneddensurveys.co.uk/2013/10/31/sutherland-avenue/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Strathclyde Fire &amp; Rescue</title>
		<link>http://www.sneddensurveys.co.uk/2013/10/31/strathclyde-fire-rescue/</link>
		<comments>http://www.sneddensurveys.co.uk/2013/10/31/strathclyde-fire-rescue/#comments</comments>
		<pubDate>Thu, 31 Oct 2013 13:33:40 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Control Networks]]></category>
		<category><![CDATA[Engineering Surveying]]></category>
		<category><![CDATA[Laser Scanning]]></category>
		<category><![CDATA[Monitoring]]></category>
		<category><![CDATA[Setting Out]]></category>
		<category><![CDATA[Topographical Survey]]></category>
		<category><![CDATA[case-studies]]></category>

		<guid isPermaLink="false">http://snedden2013.ignite.camus/?p=102</guid>
		<description><![CDATA[This latest state-of-the-art fire training facility at Cambuslang will develop the regions fire fighters of tomorrow. The new facilities consist of a two-storey academic base, a facilities building with an eight-bay fire appliance garage and three practical training zones.
Our Involvement
After our initial installation of a more robust survey control network, we quickly laser scanned the [...]]]></description>
			<content:encoded><![CDATA[<p>This latest state-of-the-art fire training facility at Cambuslang will develop the regions fire fighters of tomorrow. The new facilities consist of a two-storey academic base, a facilities building with an eight-bay fire appliance garage and three practical training zones.</p>
<h3>Our Involvement</h3>
<p>After our initial installation of a more robust survey control network, we quickly laser scanned the constructed platform level of the entire site using our Leica HDS laser scanner. Using our LSS ground modelling software we then created a triangle model from this point cloud data for use in comparisons with design information. Being able to produce colour drawings showing differences from design to finished platform levels (using height banding and colour mapping techniques) means our clients can quickly identify problem areas and effectively rectify these problems with accuracy.<br />
We undertook various other surveying and setting-out roles on this project including steelwork, concrete and brickwork setting-out and analysis, level surveys and comparisons, volumetric analysis and monitoring of tunnel structure.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.sneddensurveys.co.uk/2013/10/31/strathclyde-fire-rescue/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Project Atlas</title>
		<link>http://www.sneddensurveys.co.uk/2013/10/31/project-atlas/</link>
		<comments>http://www.sneddensurveys.co.uk/2013/10/31/project-atlas/#comments</comments>
		<pubDate>Thu, 31 Oct 2013 13:32:39 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Engineering Surveying]]></category>
		<category><![CDATA[Setting Out]]></category>
		<category><![CDATA[case-studies]]></category>

		<guid isPermaLink="false">http://snedden2013.ignite.camus/?p=99</guid>
		<description><![CDATA[185-221 Buchanan Street is the latest development in Glasgow city centre which combines multiple retail units below residential properties.
Our Involvement
Using a Leica 1200 series total station we were contracted to set-out the positions of all large diameter and mini piles. Using the reflectorless capability of the Leica instrument, we were quickly able to accurately calculate [...]]]></description>
			<content:encoded><![CDATA[<p>185-221 Buchanan Street is the latest development in Glasgow city centre which combines multiple retail units below residential properties.</p>
<h3>Our Involvement</h3>
<p>Using a Leica 1200 series total station we were contracted to set-out the positions of all large diameter and mini piles. Using the reflectorless capability of the Leica instrument, we were quickly able to accurately calculate the lengths of the re-inforcing steelwork required for each large diameter pile. In addition to setting-out services, we also produced colour banded drawings showing where unexpected excavation limits were found over the entire site. The survey and setting-out methods we use for this type of pile installation ensure piles are installed at the correct location with the correct length of re-inforcing steelwork. As-built results are recorded for quality control purposes and are used by our client for charting progress.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.sneddensurveys.co.uk/2013/10/31/project-atlas/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Scottish National Portrait Gallery</title>
		<link>http://www.sneddensurveys.co.uk/2013/10/31/scottish-national-portrait-gallery/</link>
		<comments>http://www.sneddensurveys.co.uk/2013/10/31/scottish-national-portrait-gallery/#comments</comments>
		<pubDate>Thu, 31 Oct 2013 13:32:09 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Engineering Surveying]]></category>
		<category><![CDATA[Laser Scanning]]></category>
		<category><![CDATA[Setting Out]]></category>
		<category><![CDATA[case-studies]]></category>

		<guid isPermaLink="false">http://snedden2013.ignite.camus/?p=97</guid>
		<description><![CDATA[Following a three year refurbishment, Scotlands National Portrait Gallery is one of Edinburgh’s most remarkable buildings and houses a wealth of imagery and portraits of famous historical figures. Refurbishment included the installation of internal lift, new café &#38; shop as well as secondary glazing of all main windows.
Our Involvement
Using our Leica HDS high definition laser [...]]]></description>
			<content:encoded><![CDATA[<p>Following a three year refurbishment, Scotlands National Portrait Gallery is one of Edinburgh’s most remarkable buildings and houses a wealth of imagery and portraits of famous historical figures. Refurbishment included the installation of internal lift, new café &amp; shop as well as secondary glazing of all main windows.</p>
<h3>Our Involvement</h3>
<p>Using our Leica HDS high definition laser scanner, we quickly and accurately captured a stand-alone 3D point cloud of each stonework window archway. We then used a Leica 1200 series total station to accurately record key positions on each archway for use in vertically positioning the models (using the Cyclone point-cloud modelling software). We were supplied with a specific window offset and produced a 12mm thick band within the archway where the secondary glazing was to be installed. This allowed our client to accurately size all new glazing and standardise screens where possible to reduce manufacturing costs. Producing results for the internal archways was carried out using the same method but with the addition of linework shown on individual stones for use in the accurate positioning of steel brackets. Results were supplied in PDF as well as AutoCad drawing file format (with accompanying image files) for use by our clients designers.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.sneddensurveys.co.uk/2013/10/31/scottish-national-portrait-gallery/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
